McNab - Red Edge Shopping Complex
Soiltech provided Level One Supervision ( AS3798 ) and compaction control testing on the newly constructed car park which involved imported material being used to back fill around retaining walls and water tanks. This involved quality checks being done on imported materials on a regular basis along with unique challenges with regards to backfilling both around the water tanks and retaining walls.
